Industrial space earns its keep through layout. Mezzanines, racking, staff amenities and in-warehouse offices each interact with structure, fire systems and the building's approval history, and getting one of those interactions wrong is expensive to unwind. Set out what the tenancy needs to do and get a costed scope grounded in what the shed can actually support.
Fitout scopes
What gets built inside a shed
Mezzanine floors
Steel-framed floor decks that multiply usable area inside the existing clearance height.
View service Racking compliancePallet racking layouts
Selective, double-deep and drive-in racking planned around aisle widths, forklifts and the slab.
View service NCC classificationOffice-in-warehouse conversions
Turning shed volume into staffed office, showroom or lab space with the right classification treatment.
View service Essential fire safetyFire services coordination
Managing the sprinkler, hydrant and detection consequences that fitout works trigger.
View service Tenancy lifecycleRefurbishment & make-good
Repositioning tired sheds between tenants, and returning space to lease-end condition.
View serviceIndustrial geography
Sydney's warehouse precincts, west to port
Building age, clearance heights and estate rules vary sharply between precincts, and those differences flow straight into fitout cost. Find the corridor your tenancy sits in below.
Western Sydney logistics corridor
Eastern Creek, Erskine Park, Kemps Creek, Horsley Park and the Aerotropolis approaches
Area detailSouth Sydney & port precinct
Botany, Banksmeadow, Mascot, Alexandria and the Port Botany fringe
Area detailSmithfield–Wetherill Park industrial
Smithfield, Wetherill Park, Yennora, Guildford and the Cumberland spine
Area detailHow it works
From tenancy walkthrough to handover
-
01
Walk the tenancy
Clearance heights, slab condition, existing services and the building's approval history get recorded against what the operation needs the space to do.
-
02
Get a costed scope
Pricing is broken into structural, fire, services and finishing packages, with approval pathway and landlord consent steps identified up front rather than discovered mid-project.
-
03
Approvals and consents
Certifier engagement, complying development or DA lodgement, estate inductions and landlord sign-offs run before mobilisation, sequenced so they overlap where the rules allow.
-
04
Construct and certify
Works proceed in stages that keep any live operation moving, closing with fire measure certification, compliance documentation and a defect walkthrough at handover.
Straight answers
Warehouse fitout questions
Does a mezzanine need council approval?
Structural mezzanines require an approval pathway: either complying development where the site and design qualify, or a development application where they do not. Storage platforms under certain thresholds are treated differently from occupied floors. The pathway depends on the site's zoning, existing consents and the deck's intended use, and should be confirmed before steel is ordered.
Will new racking affect my fire sprinklers?
It can. Sprinkler designs assume a storage height and commodity arrangement, and racking that exceeds those assumptions may need head relocations, in-rack sprinklers or a revised fire engineering assessment. Checking the design basis before installing racking is far cheaper than rectifying after an insurer or certifier flags it.
What does make-good actually involve?
Whatever the lease says, which is the point. Typical obligations include removing tenant alterations, repairing damage beyond fair wear, repainting and returning services to the recorded condition. The schedule of condition from lease commencement is the benchmark, so obligations are priced against documents, not assumptions.
Can an office be added while the warehouse keeps operating?
Usually, yes. Office pods are generally built within a fenced work zone with separated access for deliveries and trades, and dusty or noisy stages are timed around the operation's peak hours. The staging plan forms part of the scope rather than being improvised on site.
How is fitout cost estimated for an industrial tenancy?
By scope package rather than a flat rate per square metre. Structural elements, fire services changes, electrical capacity, amenities and finishes each carry their own drivers, and two identically sized sheds can price very differently once slab condition and services capacity are inspected. That is why a walkthrough precedes any number.
Who signs off the fire safety changes after a fitout?
Accredited fire safety practitioners assess and certify the relevant measures, and the updated schedule feeds the building's annual fire safety statement. Keeping this documentation current protects the tenant and owner at audit, insurance renewal and lease end.
Warehouse fitout zones share space with forklifts, live racking and overhead work. Respect exclusion barriers and traffic management, never store stock against incomplete racking or under unfinished decks, and report struck racking uprights or damaged fire equipment immediately.
Fitout scopes
Tell us about the job
Send through the job details and we'll connect you with a licensed provider who can quote this work.
If this is an emergency or anyone is at immediate risk, contact the relevant emergency service or your network or utility operator directly instead of using this form.